Our recent project involved reglazing original wooden-framed Edwardian sash windows by replacing the single glazing with slimline double-glazed units.
Due to the client’s tight project timeline and the longer lead time required for VIG glazing, he opted for locally sourced slimline double glazing.
Scope of work:
- Restoration
- Draught-proofing
- Double glazing retrofit – install slimline double glazing units into existing sashes by retain the original glazing bars
While the scope of works did not include painting the sash windows, our team has nonetheless primed the inner boxes and sashes.
Lead Time and Work Schedule
- Glass order lead time: 1 week
- On-site work duration: 1 week
Total estimated duration: 2 weeks
Please note that the timeline may be subject to change based on supplier availability or weather conditions.
The windows are now double glazed and ready to be painted.
Looking to upgrade your single-glazed timber windows?
If you’re considering double glazing your existing single-glazed timber-framed windows, get in touch with us.
We offer a complete range of glazing options — from standard slimline double glazing to specialised high-performance Vacuum Insulated Glass (VIG).
We’ll assess your window condition and schedule to find the most suitable solution for your needs.